首页> 外国专利> Method and system of planning hydrocarbon extraction from a hydrocarbon formation

Method and system of planning hydrocarbon extraction from a hydrocarbon formation

机译:规划从烃地层中提取烃的方法和系统

摘要

A method and system of planning hydrocarbon extraction from a hydrocarbon formation. The various methods and systems take a holistic approach to producer well placement and completion, injector well placement and completion, and borehole trajectories to reach the various producer wells and injector wells, the placement and completion selections based on parameters such as initial and expected time-varying stress in the formation, stress in overburden formations, and proximity to faults.
机译:一种计划从烃地层中提取烃的方法和系统。各种方法和系统采用整体方法进行生产井的布置和完井,注入井的布置和完井,以及到达各个生产井和注入井的井眼轨迹,并根据参数(例如初始和预期时间)选择布置和完井。地层应力变化,覆盖层地应力变化以及断层附近。

著录项

  • 公开/公告号AU2007285948B2

    专利类型

  • 公开/公告日2011-01-20

    原文格式PDF

  • 申请/专利权人 LANDMARK GRAPHICS CORPORATION;

    申请/专利号AU20070285948

  • 发明设计人 RICHARD B. LOGAN;

    申请日2007-08-14

  • 分类号G06G7/48;

  • 国家 AU

  • 入库时间 2022-08-21 18:01:19

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号