首页> 外国专利> METHOD FOR STOPE-AND-FILL MINING IN SECTIONS

METHOD FOR STOPE-AND-FILL MINING IN SECTIONS

机译:分段充填法的方法

摘要

A method for stope-and-fill mining in sections involves the processes of stoping and filling in layers and in sections, mining and filling the whole mining area from bottom to top. Each batch of ore body being mined is in the shape of prism, adopting 4 accesses: a stoping access (3) at the bottom, a filling access (11) at the top and two refilling accesses (9) on two sides. Each batch of mining mainly involves 3 steps: stoping, filling and tamping. After finishing one batch of mining for ore body, the refilling access (9) is changed into a stoping access (3), and the filling access (11) is changed into a refilling access (9). This mining method is of high efficiency and safety.
机译:一种分段采场和填充采矿的方法涉及到分层和分段采空和填充,从底部到顶部整个采矿区的采矿和填充的过程。每批开采的矿体呈棱柱状,采用4个通道:底部的一个停止通道(3),顶部的一个填充通道(11)和两侧的两个补充通道(9)。每批采矿主要涉及三个步骤:停止,填充和夯实。在完成一批矿体的开采之后,将补充通道(9)更改为停止通道(3),将填充通道(11)更改为补充通道(9)。这种采矿方法具有高效率和安全性。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号