首页> 外国专利> BRIDGE DECK DISMANTLING METHOD BY MEANS OF UNITED PULLING JACK AND PIER

BRIDGE DECK DISMANTLING METHOD BY MEANS OF UNITED PULLING JACK AND PIER

机译:联合拉动千斤顶和桥墩的桥面拆除方法

摘要

PURPOSE: A method for dismantling the deck of a bridge using a lifting jack integrated in a pier is provided to dismantle the deck of a bridge without separate equipment, such as a crane, installed under the bridge. CONSTITUTION: A method for dismantling the deck(20) of a bridge using a lifting jack integrated in a pier(10) is as follows. A part of the deck around the pier is cut and dismantled in order to set a temporary facility. A temporary facility is installed on adjacent piers and a lifting jack(200) is installed on a jack base of the temporary facility. A lifting beam(300) is installed on the ground and connected to the lifting jack with a wire. The lifting beam is raised to the lower part of the bridge deck. The bridge deck is cut in order not to interfere with the piers. The lifting beam in which the bridge deck is placed is lowered.
机译:目的:提供了一种使用集成在桥墩中的起重千斤顶拆卸桥面板的方法,该方法无需在桥下安装单独的设备(例如起重机)即可拆卸桥面板。组成:一种使用集成在墩(10)中的起重器拆卸桥梁甲板(20)的方法如下。围绕码头的甲板的一部分被切掉并拆除,以设置临时设施。临时设施安装在相邻的墩上,并且起重千斤顶(200)安装在临时设施的千斤顶基座上。升降梁(300)安装在地面上,并通过电线连接至升降千斤顶。提升梁升至桥面板的下部。切割桥面是为了不干扰码头。放置桥面的提升梁下降。

著录项

  • 公开/公告号KR101026012B1

    专利类型

  • 公开/公告日2011-03-30

    原文格式PDF

  • 申请/专利权人 KOREA ERECTION CO. LTD.;

    申请/专利号KR20100117847

  • 发明设计人 LEE BONG HWAN;PARK JIN HO;

    申请日2010-11-25

  • 分类号E01D24;B66C1/16;

  • 国家 KR

  • 入库时间 2022-08-21 17:50:26

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号