首页>
外国专利>
installation apparatus and method in one united body for prefabrication upper part of bridge using lifting system with push pull mechanism
installation apparatus and method in one united body for prefabrication upper part of bridge using lifting system with push pull mechanism
展开▼
机译:使用带有推拉机构的升降系统将桥梁的上部预制在一个整体中的安装装置和方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: An embodying installation method of a prefabrication bridge upper structure using a push-pull and lifting system is provided to considerably reduce a construction period and a construction cost of a large scale bridge. CONSTITUTION: The embodying installation method of a prefabrication bridge upper structure using a push-pull and lifting system for the change or establishment of the bridge upper structure comprises the steps of; installing a lift support, a strand jack and strand jack support as the push-pull system; installing a strand jack fixed plate and upper part bridge guide beam; installing a hydraulic jack, a hydraulic jack support and a skid plate for moving the lift support, and installing a skid rail and base; installing a hydraulic jack and a hydraulic jack support for pushing an upper part bridge segment, installing a support frame device for moving the segment, and installing a sand jack for lowering a height of the upper part bridge.
展开▼