首页> 外国专利> installation apparatus and method in one united body for prefabrication upper part of bridge using lifting system with push pull mechanism

installation apparatus and method in one united body for prefabrication upper part of bridge using lifting system with push pull mechanism

机译:使用带有推拉机构的升降系统将桥梁的上部预制在一个整体中的安装装置和方法

摘要

PURPOSE: An embodying installation method of a prefabrication bridge upper structure using a push-pull and lifting system is provided to considerably reduce a construction period and a construction cost of a large scale bridge. CONSTITUTION: The embodying installation method of a prefabrication bridge upper structure using a push-pull and lifting system for the change or establishment of the bridge upper structure comprises the steps of; installing a lift support, a strand jack and strand jack support as the push-pull system; installing a strand jack fixed plate and upper part bridge guide beam; installing a hydraulic jack, a hydraulic jack support and a skid plate for moving the lift support, and installing a skid rail and base; installing a hydraulic jack and a hydraulic jack support for pushing an upper part bridge segment, installing a support frame device for moving the segment, and installing a sand jack for lowering a height of the upper part bridge.
机译:目的:提供一种采用推拉和提升系统的预制桥梁上部结构的体现安装方法,以大大减少大型桥梁的建造周期和建造成本。构成:采用推拉和提升系统来改变或建立桥梁上部结构的预制桥梁上部结构的安装方法包括以下步骤:安装升降机支架,绞线千斤顶和绞线千斤顶支架作为推拉系统;安装绞线千斤顶固定板和上部桥形导梁;安装液压千斤顶,液压千斤顶支架和用于移动升降支架的滑板,并安装滑轨和底座;安装液压千斤顶和液压千斤顶支架以推动上部桥段,安装用于移动该桥段的支撑框架装置,并安装起砂器以降低上部桥段的高度。

著录项

  • 公开/公告号KR100465628B1

    专利类型

  • 公开/公告日2005-01-13

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20020053028

  • 发明设计人 최병렬;

    申请日2002-09-03

  • 分类号E01D21/00;

  • 国家 KR

  • 入库时间 2022-08-21 22:04:17

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号