首页> 外国专利> CONSTRUCTION METHOD OF UNDERGROUND STORAGE TANK IN ROCKY SOILS

CONSTRUCTION METHOD OF UNDERGROUND STORAGE TANK IN ROCKY SOILS

机译:岩土地下储罐的施工方法

摘要

FIELD: mining.;SUBSTANCE: method involves drilling of wells to the depth of 3-5 km; some of them shall be inclined and shall converge at the depth of 3-5 km approximately to one point and shall be used as inlet ones. At that, inclination angle of those wells is chosen so that possibility of spontaneous explosion can be eliminated. Casing of sections of shafts of those wells is performed with casing pipes; squibs and main charges are supplied to them. At that, round charges from explosive in covers are used as squibs and main charges and alternate with explosion initiators, as well as radio electronic devices for receiving destroy signal. Liquid explosives are supplied to wells simultaneously with charges. Destroy signal is supplied by means of radio electronic device. Boundaries of the formed underground cavity is determined after explosion by means of seismic pickups and two inclined diverging wells are drilled approximately from one point towards its edges for its further purposeful use.;EFFECT: lower labour intensity of cavity formation.;1 dwg
机译:领域:采矿。实体:该方法涉及到3-5公里深度的井的钻探。其中一些应倾斜,并应在3-5 km的深度处收敛至大约一点,并应用作入口。那时,选择那些井的倾斜角度,从而可以消除自发爆炸的可能性。这些井的井筒部分的套管是通过套管进行的。爆管和主要收费提供给他们。那时,来自爆炸物的掩护的圆形装药被用作爆管和主装药,并与爆炸起爆器以及接收破坏信号的无线电电子设备交替使用。液体炸药与炸药同时供应到井中。销毁信号通过无线电电子设备提供。爆炸后,通过地震拾取器确定所形成的地下空腔的边界,并从一个点向其边缘钻两个倾斜的发散井,以便进一步用于目标用途。效果:降低空腔形成的劳动强度。1dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号