首页> 外国专利> TUNNEL CONSTRUCTION MANAGEMENT SYSTEM

TUNNEL CONSTRUCTION MANAGEMENT SYSTEM

机译:隧道建设管理系统

摘要

PROBLEM TO BE SOLVED: To provide a tunnel construction management system that provides support so that primary invert construction can safely be carried out near a face.;SOLUTION: The tunnel construction management system comprises: face data acquiring means for acquiring, by using coordinate data acquiring means, coordinate data for a plurality of points on an invert face 31 in a primary invert construction area 30 formed by excavating downward from a lower half plate 15 in a lower half section continuing to an upper half face 11, a lower half face 21 and a bench section 20 in a full face construction method with an auxiliary bench in which a tunnel face is excavated while being separated with a short bench into an upper half section and a lower half section; periodic scanning means which has data acquisition be carried out by the face data acquiring means at predetermined time intervals and has the acquired coordinate data stored in data storage means along with time data; and first analyzing means for analyzing the data acquired based on the periodic scanning means and stored in the data storage means using data processing means.;COPYRIGHT: (C)2012,JPO&INPIT
机译:解决的问题:提供一种隧道施工管理系统,该系统提供支持以便可以在工作面附近安全地进行一次倒立施工;解决方案:隧道施工管理系统包括:工作面数据获取装置,用于通过使用坐标数据进行获取获取装置,通过从下半部15的下半板15向下延伸至上半部11,下半部21而形成的一次反转构造区域30中的反转面31上的多个点的坐标数据以及具有辅助台面的全脸施工方法的台面部20,在该辅助台面中,挖掘隧道面并用短台面分成上下半部。周期性扫描装置,其以预定时间间隔由面部数据获取装置执行数据获取,并且将所获取的坐标数据与时间数据一起存储在数据存储装置中。 COPYRIGHT:(C)2012,JPO&INPIT;以及第一分析装置,用于分析基于周期性扫描装置获取的数据并使用数据处理装置存储在数据存储装置中。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号