首页> 外国专利> It should construct with respect to reinforcement methodological null

It should construct with respect to reinforcement methodological null

机译:它应该关于加强方法构造无效

摘要

PROBLEM TO BE SOLVED: To prevent a sideway flow of the foundation ground caused by the settlement of a banking structure regardless of existing arrangement and new arrangement, while efficiently restraining the sideway flow.;SOLUTION: This banking structure 1 to be constructed or having been constructed on the foundation ground 2 has a sheet pile wall 4 oppositely inserted into the foundation ground in its width direction from both sides in the width direction of the banking ground 3 constituting banking and having the upper end positioned in a surface layer of the foundation ground 2, an earth retaining wall 5 out-fitted on the sheet pile wall 4 in the banking ground 3, joined to the upper end of the sheet pile wall 4 and opposed in the width direction, and a connecting material 6 installed between these opposed earth retaining walls 5 and 5.;COPYRIGHT: (C)2008,JPO&INPIT
机译:解决的问题:在有效地抑制侧向流动的同时,防止由堤岸结构的沉降引起的基础地面的侧向流动,而不论现有布置和新布置如何,同时有效地抑制侧向流动。在地基2上构造的板桩墙4从构成堤岸的堤岸3的宽度方向的两侧沿宽度方向相对地插入地基地面,板桩墙4的上端位于地基的表层。如图2所示,在堤岸3中的板桩壁4上未装配的挡土墙5与板桩壁4的上端接合并在宽度方向上相对,并且在这些相对的土之间安装有连接材料6。挡土墙5和5 .;版权:(C)2008,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号