首页> 外国专利> At the time of paint construction application of the installation construction method

At the time of paint construction application of the installation construction method

机译:油漆施工时的安装施工方法的应用

摘要

PROBLEM TO BE SOLVED: To provide a method of fitting a scattering prevention net for a steel tower, reducing the time and trouble required for installation and removal work for the scattering prevention net, reducing the number of FRP-made pipe materials, FRP-made scaffolds and the like to be installed to the steel tower to half, constructed without lowering the scattering prevention net once stretched on the steel towers, and thoroughly receiving a load due to wind pressure applied to the scattering prevention net.;SOLUTION: This method of fitting the scattering prevention net for the steel tower, which covers the steel tower to prevent scattering of paints/chaplets to the outside, is characterized in that connecting ropes extended from all sides of the scattering prevention net to the outside are directly tied to the steel tower member.;COPYRIGHT: (C)2008,JPO&INPIT
机译:要解决的问题:提供一种为钢塔安装防散射网的方法,减少安装和拆卸防散射网的工作所需的时间和麻烦,减少FRP制造的管道材料(FRP制造)的数量将脚手架等安装在钢塔上的一半,构造成在伸展到钢塔上时不会降低防散射网,并且由于施加在防散射网上的风压而完全承受了载荷。为覆盖钢塔的钢塔安装防撒网,以防止涂料/碎屑撒到外部,其特征在于,从防撒网的所有侧面延伸到外部的连接绳直接系在钢上塔成员。版权所有:(C)2008,日本特许厅&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号