首页> 外文期刊>Bautechnik >Application of the manufacturing costs/construction time-method and the capacity utilization-method for the determination of general costs at claim requests according to VOB/B
【24h】

Application of the manufacturing costs/construction time-method and the capacity utilization-method for the determination of general costs at claim requests according to VOB/B

机译:根据VOB / B,在索赔要求中使用制造成本/施工时间方法和产能利用方法确定一般成本

获取原文
获取原文并翻译 | 示例
           

摘要

Based on construction business management characteristics there were two new methods - the manufacturing costs/construction time and the capacity utilization method - for the determination of general costs at claim requests according to 2 clause 5 and 6 as well as 6 clause 6 VOB/B introduced. Furthermore two already in the jurisdiction considered methods the construction work related and the construction time related method - were analyzed.
机译:根据建筑业务管理的特点,引入了两种新方法-制造成本/施工时间和产能利用方法-根据VOB / B第2条第5款和第6条以及第6条第6条引入了根据索赔要求确定一般成本的方法。 。此外,还分析了两种已经在管辖范围内考虑的与施工工作有关的方法和与施工时间有关的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号