首页> 外国专利> EFFECTIVE CYCLE TIME MANAGEMENT EMPLOYING A MULTI-HORIZON MODEL

EFFECTIVE CYCLE TIME MANAGEMENT EMPLOYING A MULTI-HORIZON MODEL

机译:采用多水平模型的有效周期时间管理

摘要

Cycle time and throughput of a manufacturing facility is effectively manages by a control system that employs a combination of a long-term horizon model and at least one short-term horizon model to generate control signals for a set of machines in a manufacturing facility. The long-term horizon model determines long-term average time allocation percentage for each machine for a given set of throughput targets and cycle time targets for products to be manufactured. Each of the at least one short-term horizon model determines queues for immediate use at processing tools, while the queues are subjected to a secondary adjustment based on the time allocation constraints generated by the long-term horizon model. The combination of the long-term and the at least one short-term horizon models provides a stable long-term proactive WIP bubble-management as well as short-term WIP bubble management.
机译:通过使用长期水平模型和至少一个短期水平模型的组合来为制造工厂中的一组机器生成控制信号的控制系统,可以有效地管理制造工厂的周期时间和生产量。长期范围模型确定了对于给定的一组吞吐量目标和要制造的产品的周期时间目标,每台机器的长期平均时间分配百分比。至少一个短期视野模型中的每一个都确定要在处理工具上立即使用的队列,而队列则根据长期视野模型生成的时间分配约束进行二次调整。长期模型和至少一个短期地平线模型的组合提供了稳定的长期主动WIP泡沫管理以及短期WIP泡沫管理。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号