首页>
外国专利>
Generation of a master schedule for a resource from a plurality of user created schedules for the resource
Generation of a master schedule for a resource from a plurality of user created schedules for the resource
展开▼
机译:从多个用户创建的资源计划中生成资源的主计划
展开▼
页面导航
摘要
著录项
相似文献
摘要
A plurality of user defined schedules are received for collecting data on a plurality of resources. A schedule is generated for data collection on at least one resource, based on processing the plurality of user defined schedules to eliminate redundant data collection on the at least one resource. Operations are executed on the at least one resource in accordance with the generated schedule.
展开▼