首页> 外国专利> Determining a Critical Path in Statistical Project Management

Determining a Critical Path in Statistical Project Management

机译:确定统计项目管理中的关键路径

摘要

An apparatus for a Gantt chart includes a processing unit which determines a range of dates for an end date for completing a task. The range comprises a first date and a final date. The apparatus includes a display which shows the range of dates for the task completion. A method for a Gantt chart includes the steps of determining a range of dates for an end date for completing a task with a processing unit. The range comprises a first date and a final date. There is the step of showing on a display the range of dates for the task completion. There is the step of showing on a display the range of the end date. An apparatus for establishing a project's performance. A method for establishing a project's performance.
机译:用于甘特图的设备包括处理单元,该处理单元确定用于完成任务的结束日期的日期范围。该范围包括开始日期和结束日期。该设备包括显示器,该显示器示出任务完成的日期范围。用于甘特图的方法包括以下步骤:确定结束日期的日期范围,以用处理单元完成任务。该范围包括开始日期和结束日期。有一个步骤,在显示器上显示任务完成的日期范围。步骤是在显示器上显示结束日期的范围。用于建立项目绩效的设备。建立项目绩效的方法。

著录项

  • 公开/公告号US2011302090A1

    专利类型

  • 公开/公告日2011-12-08

    原文格式PDF

  • 申请/专利权人 RICHARD NEWPOL;ROBERT DITMORE;

    申请/专利号US20100793473

  • 发明设计人 RICHARD NEWPOL;ROBERT DITMORE;

    申请日2010-06-03

  • 分类号G06Q10/00;

  • 国家 US

  • 入库时间 2022-08-21 17:27:12