首页> 外国专利> NEW METHOD sliding crane beams to replace the old with minimal noise main production processes

NEW METHOD sliding crane beams to replace the old with minimal noise main production processes

机译:新方法滑动吊车梁以最小的噪音替代旧的主要生产工艺

摘要

FIELD: transport.;SUBSTANCE: invention relates to modification of crane structures. New beams are made for lengthwise launching. Said beams represent three-span beams with top chord made up of two symmetric box channels rigidly jointed with wall by alloyed studs with guaranteed interference and rails secured thereon coaxially. Traveler ceiling crab is equipped with hydraulic jacks and ties for suspension of said beams. Old beam bottom chords are furnished with outrigger shores extending inside shop by width of new beams. Mounting hole is made in headwall at the level of old beam end marks to mount guide beam for feeding new beams from outside the shop. Slidable pads from, for example, PVC, are fitted on said hole. New beam is fed on guide beam to drive its end via mounting hole into shop. Said end is suspended to ceiling crab using hydraulic jacks by rigid horizontal coupling. Beam is transferred into shop over its entire length and lowered on support brackets secured to old beam bottom chords. Beam end is detached from traveler to be moved to center of gravity of new beam. New beam is suspended to crossbar resting on plungers of two hydraulic jacks arranged on ceiling crab and carried to mounting position. New beam front end is jointed with old beam butt. Ceiling crab is displaced to eliminate the clearance between three old beams and new beam to lower the latter by hydraulic jacks on support brackets and joint it with said brackets and old beam top chord. All suspensions are disconnected to displace traveler for another new beam.;EFFECT: mechanised replacement of faulty beams.;2 dwg
机译:起重机结构的改进技术领域本发明涉及起重机结构的改进。制作了新的光束以进行纵向发射。所述梁代表三跨梁,其顶弦由两个对称的箱形槽组成,箱形槽通过合金螺柱牢固地与墙连接,合金螺柱可确保干涉并在其上同轴固定导轨。旅客吊顶螃蟹配有液压千斤顶和扎带,用于悬挂所述横梁。旧的梁底和弦配有支腿支撑,在商店内延伸出新梁的宽度。在顶板上的旧梁末端标记处打了一个安装孔,用于安装导向梁,以便从车间外部送入新梁。例如由PVC制成的可滑动垫安装在所述孔上。将新梁送入导向梁,以通过安装孔将其末端驱动到车间。所述端部通过液压千斤顶通过刚性水平联轴器悬挂在天花板蟹上。梁在其整个长度上被转移到车间,并降低到固定在旧梁底弦上的支撑托架上。横梁末端从钢丝圈上脱离,以移动到新横梁的重心。新梁被悬挂在横梁上,该横梁搁置在吊顶蟹上两个液压千斤顶的柱塞上,并被抬至安装位置。新的梁前端与旧的梁对接连接。移位吊钩以消除三个旧梁和新梁之间的间隙,以通过支撑支架上的液压千斤顶将新梁降低,并将其与所述支架和旧梁顶弦连接。断开所有悬架的连接,以使行进器转移到另一个新的横梁上。效果:机械更换故障横梁; 2 dwg

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号