首页> 外国专利> BRIDGING WATER TREE POSITION STANDARDIZING METHOD AND BRIDGING WATER TREE POSITION STANDARDIZING APPARATUS

BRIDGING WATER TREE POSITION STANDARDIZING METHOD AND BRIDGING WATER TREE POSITION STANDARDIZING APPARATUS

机译:桥接水树位置标准化方法和桥接水树位置标准化装置

摘要

PROBLEM TO BE SOLVED: To provide a bridging water tree standardizing method and a bridging water tree position standardizing apparatus in which only a deteriorated portion can be recovered and a power failure time/recovering work process can be reduced by standardizing a position of a bridging water tree.SOLUTION: A DC voltage is applied between a core wire 11 and a copper tape 13 of a CV cable 10 by using a DC power source 21. A delay time is determined by using both a first current detection circuit 22 provided between one end of the copper tape 13 and a (+) side of the DC power source 21 and second current detection means 23 provided between another end of the copper tape 13 and the (+) side of the DC power source 21, the delay time being a differential between a first arrival time until a discharge current I1 generated at a bridging water tree position by applying the DC voltage arrives at the first current detection circuit 22 and a second arrival time until a discharge current I2 arrives at the second current detection circuit 23. A position of a bridging water tree is then standardized from the determined delay time.
机译:解决的问题:提供一种桥接水树标准化方法和一种桥接水树位置标准化设备,其中只能通过对桥接水的位置进行标准化来恢复劣化部分,并且可以减少停电时间/恢复工作过程解决方案:通过使用DC电源21在CV电缆10的芯线11和铜带13之间施加DC电压。通过使用一端之间提供的第一电流检测电路22来确定延迟时间。铜带13和直流电源21的(+)侧之间的距离为零,第二电流检测装置23设置在铜带13的另一端和直流电源21的(+)侧之间,延迟时间为直到通过施加直流电压在桥接水树位置生成的放电电流I1到达第一电流检测电路22为止的第一到达时间与直到放电电流I2为止的第二到达时间之间的差到达第二电流检测电路23。然后根据确定的延迟时间对桥接水树的位置进行标准化。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号