首页>
外国专利>
SYSTEM AND METHOD FOR MANAGING MEDIUM PLAN OF SHIP BUILDING
SYSTEM AND METHOD FOR MANAGING MEDIUM PLAN OF SHIP BUILDING
展开▼
机译:船舶建造中期计划管理系统和方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: a kind of system and a kind of method,Subdivision load analysis unit, which is supplied to, for the interim shipbuilding of manage and dispatch and improves load analysis proposes the accuracy of H.D interim scheduling and process consistency rate and reduce people-time production management. ;CONSTITUTION: system (100) includes resolution unit (100), unit (120) for managing interim scheduling, one interim schedule planning unit (130), an adjustment unit (140), balancing unit (150) and control unit (160). The workload of analytical unit analysis every team or every group of department are related to the material of shipbuilding industry. The unit determines the workload of each team or each group of optimum load department is based on analysis word load. If the interim schedule planning unit determines to be scheduling to optimization/final interim scheduling each team workload or each group of optimal load department in initial period. Adjustment unit adjusts workload team or each group, if each team or each group of department of workload are not optimal loads. Balancing unit acting load balancing every team workload or each group of department's result,And it is adjusted according to the workload. ;The 2013 of copyright KIPO submissions;[Reference numerals] (110) analytical unit; (120) decision unit; (130) interim schedule planning unit; (140) adjustment unit; (150) Balancing unit; (160) unit is compareed
展开▼