首页> 外国专利> CONSTRUCTION SEQUENCE OPTIMIZATION METHOD OF THE STRUCTURE

CONSTRUCTION SEQUENCE OPTIMIZATION METHOD OF THE STRUCTURE

机译:结构的施工顺序优化方法

摘要

PURPOSE: A structure construction order optimization method is provided to improve construction safety by finding a skeleton construction order for minimizing displacement. CONSTITUTION: A modeled structure is modeled through a data conversion function in a structure analysis program(S1). A sequential construction order is determined for each section(S2). A minimum member construction unit is established(S3). An initial activation break point and a member are established(S4). A structure analysis process is performed at the initial activation break point(S5). A member which has minimum displacement is activated based on a result from the structure analysis process(S6). A structure model is reestablished(S7).
机译:目的:提供一种结构施工顺序优化方法,以通过查找骨架结构施工顺序以最小化位移来提高施工安全性。构成:通过结构分析程序(S1)中的数据转换功能对结构进行建模。为每个部分确定顺序的施工顺序(S2)。建立最小成员构造单元(S3)。建立初始激活断点和成员(S4)。在初始激活中断点执行结构分析过程(S5)。根据结构分析处理的结果,激活位移最小的构件(S6)。重新建立结构模型(S7)。

著录项

  • 公开/公告号KR101229140B1

    专利类型

  • 公开/公告日2013-02-01

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20100114214

  • 发明设计人 서지현;김영섭;최 항;

    申请日2010-11-17

  • 分类号G06F19;

  • 国家 KR

  • 入库时间 2022-08-21 16:25:48

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号