Research on Optimizing Method of Spatial Layout and Construction Time Sequence for Coal-to-Electricity Project

机译:煤电项目空间布局与施工时序优化方法研究

获取原文

摘要

With the implementation of coal-to-electricity project, a large amount of electric heating loads is connected to the power grid, which causes impact on the power grid, but also brings new distribution network planning problem. In order to solve this problem, this paper establishes the model of coal-to-electricity project from two aspects of spatial layout and construction time sequence. In the solution of the model, the weighted Voronoi diagram method is firstly used to partition the area to form multiple partition schemes. Then, using the idea of dynamic programming, the problem is divided into several stages. In a single stage, the genetic algorithm is used to obtain the optimal substation planning scheme of the corresponding partition scheme, and the backtracking algorithm is used to generate the timing sequence decisions. Finally, the optimal planning scheme is obtained by calculating the sum of annual investment in each stage through reverse recursive method. The results show that the scheme can meet the requirements of distribution network in practical construction.
机译:随着煤电项目的实施,大量的电热负荷接入电网,不仅对电网造成影响,而且带来了新的配电网规划问题。为了解决这个问题,本文从空间布局和施工时序两个方面建立了煤电项目模型。在模型的求解中,首先采用加权Voronoi图法对区域进行划分,形成多个划分方案。然后,使用动态编程的思想,将问题分为几个阶段。在单个阶段中,遗传算法用于获得相应分区方案的最佳变电站规划方案,而回溯算法则用于生成时序决策。最后,通过反向递推法计算各阶段的年投资额,得出最优的计划方案。结果表明,该方案在实际建设中可以满足配电网的要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号