METHOD FOR NON EXCAVATED EXCAVATING CONSTRUCTION USING STEEL PIPE AND STEEL PIPE WITH HOLE

机译:钢管和带孔钢管的非开挖施工方法

摘要

The present invention relates to a non-excavation method using the drilling steel and yugonggwan, press fitting at a predetermined interval in the ground The operation by which the press-yugonggwan obliquely upward between a large steel pipe after the grouting over the longer yugonggwan sheets by drilling unit drilling the inside after forming the hypothesis loop and placing the wall between the large steel tubes to make room to form a lining You can easily and shorten the construction period, and if great through the girder and slab to form a structure to provide a non-excavation excavation method using a steel pipe and yugonggwan that can be excavated inside. ; The purpose Large steel press fitting step of press fitting a large number of steel the present invention in the width direction and the height of the space to be excavated for achieving; Towards the formation of a large steel pipe steel pipe inside the neighboring press-fitted into the indentation direction along the width direction upward at a slope of a large steel pipe pushing the number of yugonggwan then the grouting between the internal yugonggwan by large steel pipe to penetrate the grout material into the surrounding yugonggwan hypothesis hypothesis that the loop forming step of forming a loop; After the hypothesis of a loop between the large steel pipe was excavated by a certain depth, while the lower reinforcing the bottom of the loop, forming a hypothesis lining and forward them to the hypothesis loop iterations performed by lining up the indentation depth of forming large steel pipe; Press-fitting a plurality of yugonggwan inclined outwardly toward the formation of a large steel pipe steel pipe inside the neighboring two sides of a large steel pipe is press-fitted into the vertical direction at a predetermined interval, and the grout material is as close to the grouting yugonggwan through the interior of yugonggwan hypothesis wall forming step such that the height direction is formed on both sides in the hypothesis wall between the large steel pipes by allowing penetration; The hypothesis was digging through the wall at a predetermined depth between a hypothesis and then while reinforcing walls and large steel pipe to form a lining and enforce them repeatedly to form hypotheses advanced to the indentation depth of the wall lining of the large steel pipe stage; Coupling the hypothesis underlying loop and placing a large steel pipe press-fitted in the width direction and the height direction through the space between the excavation wall, and installing the slab in the girder being connected to the girder structure to form a side-end in the ground; Be made to the technical subject matter, including the steps of digging a digging inside the great surface structure.
机译:本发明涉及一种使用钻探钢和yugonggwan的非开挖方法,其以预定的间隔压入地面。在较长的yugonggwan板上进行灌浆之后,press-yugonggwan在大型钢管之间倾斜向上的操作。钻探单元在形成假设环并在大型钢管之间放置壁以腾出空间以形成衬砌后在内部钻孔,您可以轻松地并缩短施工周期,如果较大,则可以通过大梁和平板形成结构以提供非开挖的方法是使用可在内部开挖的钢管和yugonggwan。 ;目的大型钢压装步骤是将本发明的钢在宽度方向和高度上压装以实现挖掘的空间;朝着在相邻的内部形成大型钢管的方向,沿宽度方向向上压入到压痕方向的大型钢管的斜面处,在该大型钢管的坡度上推入数个钢管,然后用大型钢管将内部钢管之间的注浆将灌浆材料渗透到周围的yugonggwan假说中,假说是形成圈的圈形成步骤;在将大型钢管之间的环的假设挖出一定深度后,将下部钢管加固环的底部,形成一个假设衬里,并将它们转发到通过排列形成较大的压痕深度而进行的假设环迭代钢管在大型钢管的相邻两侧内侧压入朝大型钢管的形成方向向外倾斜的多个钢管,以预定的间隔在垂直方向上压配,并且灌浆材料尽可能地接近穿过注贡壁假设壁形成步骤的内部进行注浆注贡壁,使得通过允许渗透在大钢管之间的注壁的两侧形成高度方向;假设是在假设之间的预定深度处挖掘墙壁,然后加固墙壁和大型钢管以形成衬里,并反复执行以形成前进至大型钢管阶段壁衬的压痕深度的假设。耦合假设下层回路,并在开挖壁之间的空间中将一条沿宽度方向和高度方向压入配合的大型钢管放置,并将平板安装在与梁结构连接以形成侧端的梁中地面;对技术主题,包括在大表面结构内部进行挖掘的步骤。

著录项

  • 公开/公告号KR101234270B1

    专利类型

  • 公开/公告日2013-02-19

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20090092281

  • 发明设计人 허영부;

    申请日2009-09-29

  • 分类号E21D9/00;E21D9/04;E02D29/045;

  • 国家 KR

  • 入库时间 2022-08-21 16:25:42