首页> 外国专利> INVERT CONSTRUCTION METHOD IN ROAD TUNNEL, AND INVERT

INVERT CONSTRUCTION METHOD IN ROAD TUNNEL, AND INVERT

机译:公路隧道反施工方法及反

摘要

PROBLEM TO BE SOLVED: To provide an invert construction method of a road tunnel which can be performed without interfering with high-speed traffic by widening a traffic lane, and an invert.;SOLUTION: In an invert construction method of a road tunnel: a traffic lane 2 in a tunnel 1 is widened from a center line C1 of a tunnel cross section into an adjacent traffic lane to define a primary widened traffic lane 4 and a primary real work area 5 for excavation; a primary base course 6 is primarily excavated to expose a primary base end part 8 of a lining 7; straight steel pipes 11 are inserted from a primary recess into a secondary base course 10; primary concrete 13 is placed along a curve V and residual parts 14 of the straight steel pipes 11 are connected to the base end part of the primary concrete 13; and the primary base course is regenerated and temporary pavement 15 is constructed on the surface thereof. Subsequently, the adjacent traffic lane is widened to the traffic lane 2 side to define a secondary widened traffic lane and a secondary real work area; the secondary base course is regenerated in a manner similar to the case of the primary real work; and both the traffic lanes are restored to original width by constructing pavement over both the base courses.;COPYRIGHT: (C)2014,JPO&INPIT
机译:解决的问题:提供一种公路隧道的倒置施工方法,该方法可以通过加宽行车道来进行而不会干扰高速交通,并且可以倒置;解决方案:在公路隧道的倒置施工方法中:隧道1中的行车道2从隧道横截面的中心线C1加宽到相邻的行车道,以限定主要的加宽行车道4和主要的实际工作区域5用于挖掘;首先挖出初级基层6,以露出衬里7的初级基端部分8。直钢管11从第一凹部插入第二基座10。沿曲线V放置初级混凝土13,并且将直钢管11的残余部分14连接至初级混凝土13的基端部分。初级基层被再生,并且在其表面上构造临时路面15。随后,将相邻行车道加宽到行车道2侧,以限定第二个加宽的行车道和第二个实际工作区域;中学基础课的学习方式与小学实际工作的情况相似;并通过在两个基层上铺设人行道将两条行车道恢复到原来的宽度。;版权所有:(C)2014,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号