Large span new arch bridge and its construction method

机译:大跨度新拱桥及其施工方法

摘要

Girders ( 2 ) , a large span new arch bridge comprising two auxiliary pier ( 12, 13 ) as a central pier ( 11 ) and across the fulcrum of an intermediate fulcrum , the arch axis connecting body ( 3 ) and toward the top convex and further comprising an arch axis bending beams of two arcuate ( 4,5 ) which became , the arch axis connecting body ( 3 ) is placed in the center pier ( 11 ) , the beams at both ends is bent two arch axis , respectively are connected by the end coupled to the inner end of the ( 4,5 ) , the outer end of the two arch axis bending beams ( 4, 5 ) is placed on the two auxiliary pier ( 12, 13 ) each , the two arch axis between the beams ( 4, 5 ) and the girder ( 2 ) bend are connected by a plurality of cables . In addition , construction method of the arch bridge is also disclosed . By using a bi- arch axis , greatly improves the cross-section bending strength of the bridge arch , and reduce the arch cross-section bending moment in the middle fulcrum , small vertical direction of displacement in the lumbar region of the arch , the deformation of the girder is also reduced to balance the force of the entire bridge receives , it is possible to reduce the implementation costs effectively , it is possible to shorten the construction period . [ Selection Figure ] Figure 1
机译:大梁(2),一种大跨度的新拱桥,包括两个作为中心墩(11)的辅助墩(12,13)并跨过中间支点,拱轴连接体(3)并朝向上凸和进一步包括两个弓形弯曲的弓形轴4,5,弓形轴连接体(3)置于中心墩(11)中,两端的弓形弯曲两个弓形轴,分别连接通过连接到(4,5)内端的一端,两个拱形轴弯曲梁(4、5)的外端分别放置在两个辅助墩(12、13)上,两个拱形轴之间梁(4,5)和梁(2)的弯曲通过多条电缆连接。另外,还公开了拱桥的施工方法。通过使用双牙弓轴,大大提高了牙弓的横截面弯曲强度,并减小了中支点的牙弓横截面弯矩,在腰椎弓形区域垂直位移较小,变形较小。大梁的间距也减少了,以平衡整个桥梁受力,可以有效降低实施成本,可以缩短施工周期。 [选型图]图1

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号