首页> 外国专利> Construction methods and waterproofing work Jaco waterproofing work space

Construction methods and waterproofing work Jaco waterproofing work space

机译:施工方法和防水工作Jaco防水工作空间

摘要

PROBLEM TO BE SOLVED: To provide a method for constructing cutoff work space, which allows a caisson for cutoff work to be stably fixed without water leakage, even for an uneven surface shape of a wall body on the waterfront or a pile body or structure standing in water; and a caisson for the cutoff work.;SOLUTION: A water cutoff material 3 formed of a soft independent foam body with water impermeability extends from the front end of the front face of a casson 2 having openings at the front face and the top face. When the caisson 2 is installed at a predetermined position, the water cutoff material 3 comes in contact with a wall body 12, in a state that water W flows inside the caisson 2 through an opened communication port 6 which is disposed at the caisson 2 to allow the inside and the outside of the caisson 2 to be communicated with each other. The caisson 2 is fixed to the wall body 12 by upper fixing means 7 and lower fixing means 8. The communication port 6 is then closed to discharge the water W inside the caisson 2 outside. Before or after the discharge, a rubber tube 4 extending along the water cutoff material 3 at the back face thereof is expanded, so that the water cutoff material 3 is pressed to the wall body 12.;COPYRIGHT: (C)2013,JPO&INPIT
机译:解决的问题:提供一种构造截断工作空间的方法,该方法即使在海滨壁体的表面形状不均匀,桩身或结构站立时也能稳定地固定截断工作的沉箱而不会漏水。在水里;解决方案:由具有不透水性的柔软的独立泡沫体形成的阻水材料3从在正面和顶面具有开口的棺材2的正面的前端延伸。当将沉箱2安装在预定位置时,在水W通过设置在沉箱2上的敞开的连通口6流到沉箱2内的状态下,防水材料3与壁体12接触。使沉箱2的内部和外部彼此连通。沉箱2通过上固定装置7和下固定装置8固定在壁体12上。然后,关闭连通口6,将沉箱2内的水W向外部排出。在排放之前或之后,沿着防渗水材料3的背面延伸的橡胶管4膨胀,从而将防渗水材料3压在壁体12上。版权所有:(C)2013,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号