首页> 外国专利> Wall waterproof construction method and waterproof wall

Wall waterproof construction method and waterproof wall

机译:墙面防水施工方法及防水墙

摘要

PROBLEM TO BE SOLVED: To make a cutoff of water of a concrete wall provided with a plate material such as a heat insulation material 44.;SOLUTION: A first cutoff ring 32 is crushed with a wall body 12 and the heat insulation material 44, and a cutoff material 42 pressed out of a recessed part 40 of an elastic dish part 38 flows in a gap between an adjustment pipe 26 and a through hole 46 of the heat insulation material 44, so a leakage of water in the gap is stopped. Further, a second cutoff ring 34 is crushed with a waterproof sheet 48 and a concrete wall 62, and a cutoff material 58 pressed out of a recessed part 56 of an elastic dish part 54 flows in a periphery of a penetration hole 50 of the waterproof sheet 48 and a gap between an adjustment pipe 26 close to the penetration hole 50 and a through hole 46 of the heat insulation material 44, so a leakage of water in the periphery is stopped. Furthermore, both ends of the through hole 46 of the heat insulation material 44 are sandwiched between the first cutoff ring 32 and second cutoff ring 34, so the cutoff material is prevented from overflowing to move to other places.;COPYRIGHT: (C)2013,JPO&INPIT
机译:要解决的问题:为了截断设置有诸如隔热材料44之类的板材的混凝土墙的水;解决方案:用壁体12和隔热材料44压碎第一截止环32。并且,从弹性碟形部38的凹部40中压出的切断材料42在调节管26与隔热材料44的贯通孔46之间的间隙中流动,从而阻止该间隙中的水的泄漏。此外,第二截流环34被防水片48和混凝土壁62压碎,并且从弹性碟形部分54的凹进部分56中压出的截流材料58在防水的通孔50的周围流动。薄板48和靠近通孔50的调节管26与绝热材料44的通孔46之间的间隙,从而阻止了周围水的泄漏。此外,绝热材料44的通孔46的两端被夹在第一截止环32和第二截止环34之间,因此防止了截止材料溢出而移动到其他地方。版权所有:(C)2013 ,JPO&INPIT

著录项

  • 公开/公告号JP5504231B2

    专利类型

  • 公开/公告日2014-05-28

    原文格式PDF

  • 申请/专利权人 菅野 征人;

    申请/专利号JP20110201504

  • 发明设计人 菅野 鋭一;菅野 裕之;菅野 征人;

    申请日2011-09-15

  • 分类号E02D31/02;

  • 国家 JP

  • 入库时间 2022-08-21 16:13:26

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号