首页> 外国专利> Dismantlement manner of super high building

Dismantlement manner of super high building

机译:超高层建筑拆除方式

摘要

PPROBLEM TO BE SOLVED: To provide a method of demolishing a super-highrise building capable of demolishing the super-highrise building exceeding 60 m in a short period while utilizing such conventional merits that a large-sized heavy machine does not need to be used, the entire surface of the building does not need to be covered, and noise and dust are prevented from being produced. PSOLUTION: Masts are vertically installed around the super-highrise building. A mast retraction means is attached to each mast. A shielding body capable of guiding and lifting each mast and of carrying a demolished machine is so assembled as to surround the super-highrise building. The mast is extended upward in order by connecting the mast member to the mast with the mast retraction means. The shielding body is raised while carrying the demolished machine, and the super-highrise building is demolished in order from the uppermost story toward the lower stories. Each time the story to be demolished is moved downward, the shielding body is lowered in order and the periphery of the story to be remodeled is enclosed, and the mast member is removed from the mast by the mast retraction means for shortening the mast. PCOPYRIGHT: (C)2010,JPO&INPIT
机译:

要解决的问题:提供一种拆除超高层建筑的方法,该方法能够在短时间内拆除超大型建筑物,同时利用大型重型机械不需要的传统优点,而在短时期内拆除超过60 m的超高层建筑。使用时,不需要覆盖建筑物的整个表面,并且可以防止产生噪音和灰尘。

解决方案:桅杆垂直安装在超高层建筑周围。桅杆缩回装置附接到每个桅杆。能够引导和提升每个桅杆并能够承载拆卸的机器的屏蔽体被组装成围绕超高层建筑。通过用桅杆缩进装置将桅杆构件连接到桅杆,桅杆向上依次延伸。搬运被拆除的机器时,屏蔽体被抬高,并且从最高层到较低层的顺序对超高层建筑进行了拆除。每次将要拆除的故事层向下移动时,屏蔽体依次降低,并且要改造的故事层的外围被封闭,并且通过桅杆缩回装置从桅杆上移除桅杆构件以缩短桅杆。

版权:(C)2010,日本特许厅&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号