An energy-aware backfill scheduling method combines overestimation of job run-times and processor adjustments, such as dynamic voltage and frequency scaling, to balance overall schedule performance and energy consumption. Accordingly, some scheduled jobs are executed in a manner reducing energy consumption. A computer-implemented method comprises identifying job performance data for a plurality of representative jobs and running a simulation of backfill-based job scheduling of the jobs at various combinations of run-time over-estimation values and processor adjustment values. The simulation generates data including energy consumption and job delay. The method further identifies one of the combinations of values that optimizes the mathematical product of an energy consumption parameter and a job delay parameter using the simulation generated data for the plurality of jobs. Jobs submitted to a processor are then scheduled using the identified combination of a run-time over-estimation value and a processor adjustment value.
展开▼