首页> 外国专利> Dynamically change allocation of resources to schedulers based on feedback and policies from the schedulers and availability of the resources

Dynamically change allocation of resources to schedulers based on feedback and policies from the schedulers and availability of the resources

机译:根据调度程序的反馈和策略以及资源的可用性,动态更改对调度程序的资源分配

摘要

A resource manager manages processing and other resources of schedulers of one or more processes executing on one or more computer systems. For each scheduler, the resource manager determines an initial allocation of resources based on the policy of the scheduler, the availability of resources, and the policies of other schedulers. The resource manager receives feedback from the schedulers and dynamically changes the allocation of resources of schedulers based on the feedback. The resource manager determines if changes improved the performance of schedulers and commits or rolls back the changes based on the determination.
机译:资源管理器管理在一个或多个计算机系统上执行的一个或多个进程的调度程序的处理和其他资源。对于每个调度程序,资源管理器根据调度程序的策略,资源的可用性以及其他调度程序的策略来确定资源的初始分配。资源管理器从调度程序接收反馈,并根据该反馈动态更改调度程序的资源分配。资源管理器确定更改是否提高了调度程序的性能,并根据确定结果提交或回滚更改。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号