首页> 外文期刊>E3S Web of Conferences >Research on Schedule Risk of Ship Maintenance Project Resource Allocation Based on System Dynamics
【24h】

Research on Schedule Risk of Ship Maintenance Project Resource Allocation Based on System Dynamics

机译:基于系统动态的船舶维护项目资源配置的时间表风险研究

获取原文
           

摘要

Ship maintenance requires the use of a lot of resources, and the schedule risk caused by resource factors is an important reason for the long time and easy delay of maintenance projects. This paper adopts system dynamics theory to analyze the dynamic relationship between activity delay and resource allocation factors, and establishes a risk assessment model. Use anylogic software to simulate the implementation process of activities, and effectively simulate the mutual influence and change process of various risk factors, so as to achieve the purpose of accurately and effectively estimating the duration of project activities.
机译:船舶维护需要使用大量资源,资源因素造成的日程风险是长时间和轻松延迟维护项目的重要原因。 本文采用系统动力学理论,分析活动延迟与资源分配因子之间的动态关系,并建立了风险评估模型。 使用AnyLogic软件来模拟活动的实施过程,有效地模拟各种风险因素的相互影响和变化过程,从而达到准确,有效地估算项目活动持续时间的目的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号