首页> 外国专利> OFF-SHORE INSTALLATION VESSEL, METHOD OF OPERATING AN OFF-SHORE INSTALLATION VESSEL

OFF-SHORE INSTALLATION VESSEL, METHOD OF OPERATING AN OFF-SHORE INSTALLATION VESSEL

机译:离岸安装船,操作离岸安装船的方法

摘要

An off-shore installation vessel (1) comprises a single hull (2), a ballast system (3), and an installation device (6). The single hull has a transit displacement at a transit draft and a maximum displacement at a maximum draft. The single hull comprises a bottom (18), a bilge (20), and a side (22). The side comprises an oblique side part (24) and a vertical side part (26). The vertical side part is at a greater distance from a centreline plane (CL) than the bilge. The oblique side part extends from the bilge to the vertical side part. The ballast system comprises ballast water tanks (32) with a capacity that is at least equal to the difference between the maximum displacement and the transit displacement for changing the draft of the off-shore installation vessel from the transit draft to the maximum draft. The transit waterline(10) intersects the oblique side part.
机译:海上安装船(1)包括单个船体(2),压载系统(3)和安装装置(6)。单个船体在运输吃水深度处有一个运输位移,在最大吃水深度处有一个最大位移。单个船体包括底部(18),舱底(20)和侧面(22)。该侧面包括倾斜的侧面部分(24)和竖直的侧面部分(26)。垂直侧部与中心线平面(CL)的距离比舱底大。倾斜的侧面部分从舱底延伸到垂直的侧面部分。压载系统包括压载水箱(32),该压载水箱的容量至少等于最大位移和运输位移之间的差,用于将近海安装船的吃水从运输吃水改变为最大吃水。过境水线(10)与斜边部分相交。

著录项

  • 公开/公告号WO2013191543A1

    专利类型

  • 公开/公告日2013-12-27

    原文格式PDF

  • 申请/专利权人 ITREC B.V.;

    申请/专利号WO2013NL50432

  • 发明设计人 BEREZNITSKI ALEXEI;ROODENBURG JOOP;

    申请日2013-06-18

  • 分类号B63B1/04;B63B43/04;B63B27/10;

  • 国家 WO

  • 入库时间 2022-08-21 15:52:31

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号