首页> 外文会议>36th International conference on ocean, offshore and arctic engineering 2016 >DESIGN, CONSTRUCTION, AND INSTALLATION OF OFF-SHORE WIND TURBINE WITH TRIPOD SUCTION BUCKET FOUNDATION
【24h】

DESIGN, CONSTRUCTION, AND INSTALLATION OF OFF-SHORE WIND TURBINE WITH TRIPOD SUCTION BUCKET FOUNDATION

机译:带三段式吸水桶基础的海上风轮机的设计,施工和安装

获取原文
获取原文并翻译 | 示例

摘要

As part of the national off-shore wind power development project by the government of Korea, the very first off-shore wind turbine utilizing tri-pod suction buckets for its sub-surface foundation has been successfully completed. This off-shore wind turbine with a capacity of 3MW has been designed, constructed, and installed in late 2016. It is located approximately 200 meters offshore with a water depth of approximately 10 meters. Sub-surface soil consists of interbedded clay and sand layers. Details of the design, construction, and installation of this wind turbine with tripod suction bucket foundation system are described and discussed.
机译:作为韩国政府制定的国家海上风电开发项目的一部分,首个使用三脚架吸水桶作为地下基础的海上风电已经成功完成。该海上风力涡轮机的容量为3MW,已于2016年底进行了设计,建造和安装。它位于离岸约200米处,水深约10米。表层土壤由互层的粘土和沙层组成。描述并讨论了带有三脚架吸水桶基础系统的该风力发电机的设计,构造和安装的详细信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号