SYSTEM OF CREATING MASTER DATA FOR CONSTRUCTION PROCESS SCHEDULE
SYSTEM OF CREATING MASTER DATA FOR CONSTRUCTION PROCESS SCHEDULE
展开▼
机译:施工进度计划主数据创建系统
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a system of creating master data for construction process schedule capable of easily creating a construction process schedule of a plant.;SOLUTION: The system of creating master data for construction process schedule includes: a database 34 which stores plural construction process schedules in which model and region of a plant are associated with each other; sorting means 35 that sorts the plural construction process schedules stored in the database 34 into groups of construction process schedule on the basis of the model and the region; and interrelation estimation means 371 that estimates interrelation on the basis of work item on the work items included in the groups of construction process schedule by performing statistical processing on the groups of construction process schedule sorted in the sorting means 35.;COPYRIGHT: (C)2015,JPO&INPIT
展开▼