首页> 外国专利> OPERATION REGULATION METHOD OF TRAIN BY SEISMOMETER INSTALLED ON RAILROAD STRUCTURE

OPERATION REGULATION METHOD OF TRAIN BY SEISMOMETER INSTALLED ON RAILROAD STRUCTURE

机译:铁路结构上地震仪对列车运行的调节方法

摘要

PROBLEM TO BE SOLVED: To provide an operation regulation method of a train by a seismometer installed on a railroad structure capable of optimizing train operation regulation upon an earthquake, by the seismometer installed on the railroad structure.;SOLUTION: In an operation regulation method of a train, a plurality of seismometers 5 are installed on a railroad structure 2 in addition to installation of a seismometer 4 on the ground 1, to thereby execute train stop determination and operation resumption determination at the generation time of an earthquake in consideration of not only an influence of earthquake motion on the railroad structure 2 but also an influence on an auxiliary facility on the railroad structure 2.;COPYRIGHT: (C)2015,JPO&INPIT
机译:解决的问题:通过安装在铁路结构上的地震仪,通过安装在铁路结构上的地震仪,提供一种火车的运行调节方法,以能够优化地震时火车的运行规则。在火车上,除了将地震仪4安装在地面1上之外,还在铁路结构2上安装多个地震仪5,从而不仅考虑地震而在发生地震时执行火车停止确定和操作恢复确定。地震对铁路结构2的影响,也对铁路结构2上的辅助设施的影响;版权所有:(C)2015,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号