首页> 外国专利> The ombrometer and the seismometer are installed in the alteration mannered null railroad of the operational regulation value

The ombrometer and the seismometer are installed in the alteration mannered null railroad of the operational regulation value

机译:里程表和地震仪安装在运行规定值的零位铁路上

摘要

PROBLEM TO BE SOLVED: To provide a change method of an operation control value against complex disaster of rain and an earthquake with which accurate preventive measures against complex disaster of rain and an earthquake can be taken.;SOLUTION: In the change method of an operation control value against complex disaster of rain and an earthquake, a rain gauge 3 and a seismometer 2 are installed in the vicinity of a natural slope 1 near a railroad or a road, and rainfall data in the past by the rain gauge 3 and earthquake data in the past by the seismometer 2, degree of damage of the slope 1 by rain or an earthquake, and degree of disaster prevention of the slope 1 by disaster prevention works are previously accumulated in a storage unit 4C of a processor 4. And when the rainfall data by the rain gauge 3 or the earthquake data by the seismometer 2 is newly measured, the data accumulated in the storage unit 4C is read out by a central processing unit 4B to change the operation control value of the railroad or the road.;COPYRIGHT: (C)2012,JPO&INPIT
机译:要解决的问题:提供一种针对降雨和地震的复杂灾难的操作控制值的更改方法,可以采取准确的预防措施来针对降雨和地震的复杂灾难的预防。为了抵抗雨水和地震的复杂灾害的控制值,在铁路或道路附近的自然坡度1附近安装了雨量计3和地震仪2,并且通过雨量计3和地震数据过去的降雨数据过去,地震计2将斜坡1由于雨水或地震的破坏程度和斜坡1由于防灾工作的防灾程度预先存储在处理器4的存储单元4C中。重新测量雨量计3的降雨数据或地震仪2的地震数据,由中央处理单元4B读出存储在存储单元4C中的数据以改变操作控制值铁路或公路的位置。;版权所有:(C)2012,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号