首页> 外国专利> METHOD FOR OPENING WORKING HORIZONS of open pits in complex hydrogeological conditions

METHOD FOR OPENING WORKING HORIZONS of open pits in complex hydrogeological conditions

机译:复杂水文地质条件下露天矿作业水平的方法

摘要

A method for opening working levels of an open pit involves penetration of inclined entry trench with extraction of rocks with a straight shovel type excavator, installed inside the trench and working with loading rocks to the road transport means that are at its level of location. In the circuit of entry trench with excavator with bottom digging there is penetrated an inclined advancing trench with a slope equal to the slope of the entry trench and the width at the bottom equal to the width of the single-lane road, the distance to the plane between the excavators faces is to be at least 25 m, with a slope of the trench 80 ‰, for providing location of the mechanical shovel at least 2 m above the bottom of the lower face of the excavator with lower digging.
机译:一种用于打开露天矿的工作水平面的方法,包括使用直铲式挖掘机将倾斜的进入沟渠穿入并抽出岩石,该挖掘机安装在沟渠内,并在其所在位置处将岩石装载到公路运输工具上。在带有挖底挖土机的入口沟渠回路中,穿过一个倾斜的前进沟渠,该斜坡的斜率等于入口沟渠的斜率,而底部的宽度等于单车道的宽度,挖掘机工作面之间的平面至少应为25 m,沟槽的坡度应为80‰,以便在挖掘时应在挖掘机下工作面底部上方至少2 m处提供机械铲的位置。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号