首页> 外国专利> Connection between a foundation post of a structure, in particular an onshore or offshore construction, such as an onshore or offshore wind turbine, comprising in a particular tubular transition piece and method for manufacturing the same

Connection between a foundation post of a structure, in particular an onshore or offshore construction, such as an onshore or offshore wind turbine, comprising in a particular tubular transition piece and method for manufacturing the same

机译:结构的基础柱之间的连接,特别是陆上或海上建筑,例如陆上或海上风力涡轮机,包括特定的管状过渡件及其制造方法

摘要

The connection structure has a tubular transition piece (12) whose interstice (14) with a foundation pile (10) is partially filled with concrete or mortar. Two groups of three twin wedges (18,22) are arranged against each other and are rotated axially relative to each other, for suppression or inhibition of a relative movement between the foundation pile and transition piece and tilt and horizontal translational movements of the foundation pile. An independent claim is included for method for manufacturing connection structure of foundation pile.
机译:该连接结构具有管状过渡件(12),该过渡件的具有基桩(10)的空隙(14)部分填充有混凝土或砂浆。两组三个双楔块(18,22)彼此相对布置并相对于彼此轴向旋转,以抑制或抑制基础桩与过渡件之间的相对运动以及基础桩的倾斜和平移运动。本发明还包括一种用于基础桩连接结构的制造方法的独立权利要求。

著录项

  • 公开/公告号EP2772587B1

    专利类型

  • 公开/公告日2015-08-19

    原文格式PDF

  • 申请/专利权人 SCHULTES KLAUS;

    申请/专利号EP20130001017

  • 发明设计人 SCHULTES KLAUS;

    申请日2013-02-28

  • 分类号E02D27/42;

  • 国家 EP

  • 入库时间 2022-08-21 15:05:27

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号