首页>
外国专利>
COMPOSITE DECK-SEGMENT FOR CABLE-STAYED BRIDGE AND THE CONSTRUCTION METHOD
COMPOSITE DECK-SEGMENT FOR CABLE-STAYED BRIDGE AND THE CONSTRUCTION METHOD
展开▼
机译:斜拉桥复合桥面段及施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
A kind of steel combined bridge deck section suspension bridge construction method and its charging method. Plate section be arranged inner shaft (main reinforcement, distribution bar) same amount of steel-bar arrangement inner shaft not in vertical plane, but to being inclined in two side directions about perpendicular. Therefore, the thickness section of slab is reduced, to reduce the entire plate section of minimum thickness, although it is contemplated that the concrete (d3) of height (d1, d2) inner shaft and mantle thickness. ;The 2015 of copyright KIPO submissions
展开▼