首页> 外国专利> METHOD FOR DEVELOPMENT OF DOME OIL FORMATION AT LAST OPERATIONAL STAGE

METHOD FOR DEVELOPMENT OF DOME OIL FORMATION AT LAST OPERATIONAL STAGE

机译:末次开采阶段穹顶油形成方法

摘要

FIELD: oil and gas industry.SUBSTANCE: in the method for development of dome oil formation at last operational stage extraction of the product is made through producers and working fluid is injected through injectors. Local area of the deposit is selected according to difference of hypsometric depths between the producer and injector per 3 m and more. In the producer standard downhole pumping equipment is replaced by downhole pumping equipment operable on round-the-clock basis. When change in water cut per 10-15% is detected volume of extracted product is limited due to change in operation time of round-the-clock downhole pumping equipment. At that at the injector area injection is limited or the well is shut in completely. Periodic measurements are made for water cut changes in operation mode of the producer. When water cut is reduced operation is continued in elastic drive without start-up of the influencing injector. Periodic measurements of water cut and bottomhole pressure are repeated for the producer. When bottomhole pressure is reduced per 5% and more in regard to the initial measured value the injector operation is started and change in the main parameters of water cut and bottomhole pressure is controlled in the producers.EFFECT: higher oil recovery of the deposit.1 ex
机译:领域:石油和天然气工业。物质:在开发圆顶油的方法中,在最后一个操作阶段通过生产者进行产品提取,并通过注入器注入工作流体。根据生产者和注入者之间每3 m及更大的深度的深度差异来选择沉积物的局部区域。在生产者中,标准的井下泵送设备被全天候运行的井下泵送设备所代替。当检测到每10-15%的含水率变化时,由于全天候井下抽水设备的运行时间变化,提取的产品量将受到限制。因此,在注入器处的注入受到限制或井被完全关闭。定期测量生产者操作模式中的含水率变化。如果减少了含水量,则在弹性驱动下继续运行,而不会启动影响喷射器。对生产者重复进行含水率和井底压力的定期测量。当井底压力相对于初始测量值降低5%或更多时,将启动喷油器操作,并控制生产商的含水率和井底压力的主要参数变化。效果:沉积物的采油率更高1前

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号