首页> 外国专利> PSC U Steel composite PSC truss U girder simple bridge and continous bridge

PSC U Steel composite PSC truss U girder simple bridge and continous bridge

机译:PSC U钢复合PSC桁架U梁简单桥和连续桥

摘要

the present invention, a concrete lower flange (10), a pair of concrete upper flange 20, and a pair of concrete upper flange 20 and the concrete lower flange (10) sides respectively, U girder (40) including a pair of truss abdomen 30 for connection; In the end portions of the U-girder 40, the concrete lower flange (10), a pair of concrete upper flange 20, and a shift point poured concrete partition wall block (50) for connecting a pair of truss abdomen (30); Precast half deck 60 which is provided on the concrete upper flange (20); The concrete lower flange (10) of claim 1, 2, PS internal tension wire (W1, W2) to be installed therein; First and second external stress which is installed in the inner space portion of the U-girder (40) PS wire (W3, W4); It said first and second PS internal tension wire (W1, W2) a pair of first and second internal tension wire fixing PS block and the fixing part (71a, 71b) for fixing each of the; And a pair of first and second external tension PS wire fixing block diagram of, and the fixing section (73a, 73b) to the first fixation 1,2 outside tension PS wire (W3, W4), respectively, said first internal stress PS steel fixing block and the fixing portion (71a) is provided on both ends of a lower portion of the U-girder 40, a second internal stress PS wire fixing block and the fixing portion (71b) is spaced apart from both ends of the U-girder 40, the It is installed on a concrete lower flange (10), the first and second external tension PS wire fixing block and the fixing part (73a, 73b) is the installed and then down from both ends of the top of the U-girder 40, the first , two internal tension PS wire (W1, W2) is tension in the girders making section, the first and second external tension PS wire (W3, W4) is mounted on the U-girder 40 are alternately (1), wherein half precast deck (60) after the casting of slabs in the upper relates to a steel composite truss U PSC girder bridges are simply nervous. Through the present invention, a conventional steel composite PSC truss U girder than truss price jeombu, settlement blocks and fuser unit, saddle shape, it is possible to increase efficiency by improving the PC steel construction and nervous manner, the conventional PSC U girder and compared to reduce the amount of concrete girders reduce weight, reduce the amount of steel compared with steel box girder or steel girders, U can provide the effect of increasing the economic efficiency.
机译:在本发明中,混凝土下部凸缘(10),一对混凝土上部凸缘(20)以及一对混凝土上部凸缘(20)和混凝土下部凸缘(10)侧,U梁(40)包括一对桁架腹部。 30个用于连接;在U形梁40的端部,设有混凝土下部凸缘(10),一对混凝土上部凸缘20,以及连接一对桁架腹部(30)的移相浇筑混凝土隔墙砖(50)。预制半甲板60,其设置在混凝土上凸缘(20)上; 3.根据权利要求1、2所述的混凝土下凸缘(10),其特征在于,PS内部张力线(W1,W2)将被安装在其中。第一外部应力和第二外部应力安装在U型梁(40)PS线材(W3,W4)的内部空间部分中;所述第一和第二PS内部拉力线(W1,W2)分别固定一对第一和第二内部拉力线PS块以及用于固定每个的固定部(71a,71b);并且一对第一和第二外部张力PS线的固定框图,以及将固定部(73a,73b)分别固定到第一固定1,2,外部张力PS线(W3,W4)的所述第一内部应力PS钢固定块和固定部分(71a)设置在U形梁40的下部的两端,第二内应力PS线固定块和固定部分(71b)与U形梁40的两端间隔开。梁40安装在混凝土下部法兰(10)上,安装第一和第二外部张力PS钢丝固定块,然后安装固定部分(73a,73b),然后从U形顶部的两端向下放置-大梁40,第一,两个内部张力PS线(W1,W2)在大梁制作区中处于张力状态,第一和第二外部张力PS线(W3,W4)交替安装在U型梁40上(1 ),其中在上部浇铸平板后的半预制甲板(60)涉及钢复合桁架U PSC梁桥只是很紧张。通过本发明,传统的钢复合PSC桁架U形梁比桁架价格jeombu,沉降块和定影单元,鞍形,通过改进PC钢结构和紧张的方式可以提高效率,与传统的PSC U形梁进行比较为减少混凝土箱梁的重量,减少重量,减少钢箱梁的数量,与钢箱梁或钢箱梁相比,U可提供增加经济效益的效果。

著录项

  • 公开/公告号KR101606135B1

    专利类型

  • 公开/公告日2016-03-24

    原文格式PDF

  • 申请/专利权人 우경기술주식회사;

    申请/专利号KR20140074277

  • 发明设计人 노경범;노실근;노옥근;노우현;

    申请日2014-06-18

  • 分类号E01D2/00;E01D2/04;

  • 国家 KR

  • 入库时间 2022-08-21 14:12:49