首页>
外国专利>
METHOD FOR MANAGING SHIP DESIGN BUDGET BASED ON DRAWING HOURS
METHOD FOR MANAGING SHIP DESIGN BUDGET BASED ON DRAWING HOURS
展开▼
机译:基于绘制时间的船舶设计预算管理方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention is the use of untreated water correction factor for the administrative organization, the server is a new ship and the closest star standard performance line overall design untreated water and drawing untreated water share, and the whole design line of the standard earnings untreated water target design budget calculation step for calculating a total drawing and specific target design budget for the new vessel; After the drawing plans for the new vessels develop, design, budget planning and the management organizational server using the drawings by untreated water share and drafting schedule of the drawing plans for calculating the design budget implementation plan for the overall objective design budget calculating step; Design and budget progress management step of the administrative organization, the server calculates the design budget performance using a design untreated water Earnings per input drawings in real time with respect to the new vessel and comparing the design budget performance and the design budget plan ; untreated water-based ship design and drawings provide a budget comprises ;
展开▼