CONCRETE DAM BODY CONSTRUCTION METHOD

机译:混凝土坝体施工方法

摘要

PROBLEM TO BE SOLVED: To provide a concrete dam body construction method that has high cracking prevention effect from a perspective of temperature stress control.;SOLUTION: A concrete dam body construction method consists of a first construction period and a second construction period, which do not overlap one another. Average temperature of outdoor air in the second construction period is lower than that in the first construction period. A concrete installation speed in the second construction period is higher than that in the first construction period.;SELECTED DRAWING: Figure 2;COPYRIGHT: (C)2017,JPO&INPIT
机译:要解决的问题:从温度应力控制的角度,提供一种具有高防裂效果的混凝土坝主体施工方法。解决方案:混凝土坝主体施工方法由第一施工阶段和第二施工阶段组成。不互相重叠。第二施工期的室外空气平均温度低于第一施工期的平均温度。第二施工期的混凝土安装速度要高于第一施工期的速度;选图:图2;版权:(C)2017,日本特许厅&INPIT