首页> 外国专利> Construction management method for piled hole drilling

Construction management method for piled hole drilling

机译:钻孔桩施工管理方法

摘要

To provide a construction management method for a piled hole, wherein a construction manager of a pile foundation can grasp reliably and promptly whether or not a piled hole has reached a support layer.SOLUTION: The construction management method of a pilot hole includes an index measurement step S1 for measuring an index corresponding to resistance from the ground acting on an excavator while excavating a pilot hole by an excavator, and an index measurement step S1 A chart creating step S 2 of creating a chart based on the measured indices, a photographing step S 3 of photographing the chart created in the chart preparing step S 2 and acquiring an image of the chart, a photographing step S 3 of photographing step S 3 And an image sending step S4 of sending the image of the chart to the construction manager of the pile foundation on the day when the piercing hole has been excavated.BACKGROUND OF THE INVENTION
机译:提供一种用于桩孔的施工管理方法,其中桩基的施工管理者可以可靠且迅速地掌握桩孔是否到达支撑层。解决方案:导向孔的施工管理方法包括指标测量步骤S1,用于测量与通过挖掘机挖掘导向孔同时作用在挖掘机上的地面的阻力对应的指标,以及指标测量步骤S1。图表创建步骤S 2,基于所测量的指标创建图表,摄影步骤拍摄在图表制作步骤S 2中创建的图表并获取该图表的图像的步骤S 3,拍摄步骤S 3的拍摄步骤S 3以及将图表的图像发送给施工经理的图像发送步骤S4在挖出穿孔的那一天打桩基础。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号