Disclosed is a change convergence risk mapping system. The change convergence risk mapping system typically includes a processor, a memory, and a risk aggregation module stored in the memory. The change convergence risk mapping system is typically configured for: determining an event risk score for each of a plurality of events; aggregating the event risk scores of the plurality of events and determining a first aggregated risk score associated with a first time period; determining if the first aggregated risk score exceeds a first predefined aggregated risk score threshold or if a first predefined number of events associated with the first time period have an event risk score exceeding a first predefined event risk score threshold; determining a risk level for the first time period; and graphically presenting a first indicator to a user computing system of the risk level associated with the first time period.
展开▼