首页>
外国专利>
System and method for predicting significant events using a progress curve model
System and method for predicting significant events using a progress curve model
展开▼
机译:使用进度曲线模型预测重大事件的系统和方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
Described is system for predicting significant events using a progress curve model. The system first determines Z-score values for a predetermined period of a time series to generate a Z-score time series. The Z-score time series are partitioned into a plurality of E-periods to define time frames for progress curve model (PCM) fitting. An E-period is defined as a period of escalation and de-escalation. Finally, a future event is predicted based on an absolute Z-score value that is greater than or equal to a predetermined number.
展开▼