首页> 外国专利> METHOD FOR DETERMINING NUMBER OF WORKINGS WHILE CONDUCTING ENGINEERING AND GEOLOGICAL SURVEYS

METHOD FOR DETERMINING NUMBER OF WORKINGS WHILE CONDUCTING ENGINEERING AND GEOLOGICAL SURVEYS

机译:进行工程和地质调查时确定工作量的方法

摘要

FIELD: construction.;SUBSTANCE: method for determining the number of workings while conducting engineering and geological surveys includes driving the workings within the spot of a building or a structure to be projected, determining the soil deformation modulus, finding the settlement of the building or the structure at each working and the settlement unevenness between the workings, finding the base stiffness coefficient at each working at the predetermined sizes in the plan of the building or the structure and the load on the base, using at that Shephard's function for the base hardness coefficient in the form of a reduced dependence.;EFFECT: improving the accuracy of engineering and geological surveys, reducing the labour intensity and expanding the scope of application.;3 cl, 1 tbl, 6 dwg
机译:领域:建筑;实体:在进行工程和地质勘测时确定工作数量的方法,包括在要投影的建筑物或结构的地点内驱动工作,确定土壤变形模量,寻找建筑物的沉降或每次工作中的结构和工作之间的沉降不均匀性,在建筑物或结构的平面图中以预定尺寸找到每个工作时的基础刚度系数,并利用该谢泼德函数求基础硬度效果:提高工程和地质勘测的准确性,减轻劳动强度,扩大适用范围; 3 cl,1 tbl,6 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号