CONSTRUCTION MEMBER OF INTERNAL STRUCTURE OF TUNNEL VERTICAL SHAFT, LIFT FOR CONSTRUCTION, AND MATERIAL TRANSFER CARRIAGE
CONSTRUCTION MEMBER OF INTERNAL STRUCTURE OF TUNNEL VERTICAL SHAFT, LIFT FOR CONSTRUCTION, AND MATERIAL TRANSFER CARRIAGE
展开▼
机译:隧道竖井内部结构施工体,施工升降体及材料转移架
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To overcome a problem with a large cross-section tunnel construction work that no method is available to simultaneously execute internal construction work of a vertical shaft, shield excavation work, and equipment work inside a tunnel shaft, resulting in decline of work efficiency.;SOLUTION: A construction member of an internal structure of a tunnel vertical shaft comprises at least of precast members assembled in parallel crosses when seen in a planar view, and includes: four intersections provided on diagonals of a rectangle on a same horizontal plane and near an inner wall surface of a vertical shaft, aligned with a tunnel axis direction in one direction; a horizontal material connecting the adjacent intersections orthogonally; a columnar material vertically connecting the corresponding intersections in vertically adjacent layers; and a connection material connecting the intersection individually with each connecting part formed on the inner wall surface. A layer of the construction member is piled to form a superposed structure, by connecting the construction members in the vertically adjacent layers with the columnar material.;SELECTED DRAWING: Figure 3;COPYRIGHT: (C)2018,JPO&INPIT
展开▼