PROBLEM TO BE SOLVED: To efficiently ensure implementation of resource development in a region where resources may be produced.;SOLUTION: The resource development support system 1 including an information processing apparatus 103 having a processor and a memory comprises a production history storage 1041 for storing production region information which is information on a region 300 where a predetermined resource is producible and work area information which is information on an area where a work for producing the resource is performed, a development area acquisition unit 1042 for acquiring an area for developing a resource in the resource-producible region 300, a plan recommendation level calculation unit 105 for calculating a plan recommendation level which is information indicating a value of making a plan for developing the resource for the acquired area, based on an index indicating a progress of the work in an area calculated based on the production region information and the work area information, and a plan recommendation level output unit 112 for outputting the calculated plan recommendation level.;SELECTED DRAWING: Figure 1;COPYRIGHT: (C)2018,JPO&INPIT
展开▼