首页>
外国专利>
For Pile Foundations, pile injection procedure and the Manufacturing Process thereof.
For Pile Foundations, pile injection procedure and the Manufacturing Process thereof.
展开▼
机译:对于打桩基础,打桩程序及其制造过程。
展开▼
页面导航
摘要
著录项
相似文献
摘要
p For Pile Foundations,Which comprises a longitudinal Hole Bolt (1) and a Plurality of through holes (2) transverse to the longitudinal Hole (2) which extend between the longitudinal Hole Bolt (1) andThe external face of the Pile and additionally can understand a non-return Valves located in the transverse Holes (2) configured so that the transverse Holes (2) and the Vu00c1Non-return Valves allow Unidirectional Communication within the Pile out of the Pile from the longitudinal Through Hole (1) to the Outer side of the pile. / p
展开▼