首页> 外国专利> Construction management information collection device, pipeline completion map creation system, construction management information collection method, construction daily report generation method and construction daily report

Construction management information collection device, pipeline completion map creation system, construction management information collection method, construction daily report generation method and construction daily report

机译:施工管理信息采集装置,管线完工图创建系统,施工管理信息采集方法,施工日报生成方法和施工日报

摘要

PROBLEM TO BE SOLVED: To provide a construction management information collection device that can inherently manage each, even if cut pipe occurs in a construction site of pipe laying construction.SOLUTION: A construction management information collection device A is provided for collecting pipe construction management information in a construction site of pipe laying construction. The construction management information collection device includes: a pipe information acquisition unit A1 for acquiring specific pipe information including the pipe code from a pipe information label L being a pipe information display applied in a laying target pipe; a cut pipe information generation unit A2 for generating cut pipe information including the cut pipe identification information for individually identifying multiple cut pipes occurring in a construction site in association with the pipe code before the cut pipe; an imaging unit A3 for taking an image of a pipe connection part while being positioned in the vicinity of a pipe connection part; a GPS receiving unit A4 for acquiring position information; and an output unit A5 for uploading construction management information including at least pipe information, the cut pipe information, the image information of the pipe connection part and the position information in a management server B directly or through a portable storage medium.SELECTED DRAWING: Figure 1
机译:解决的问题:提供即使在配管施工的施工现场发生切管也能固有地管理的施工管理信息收集装置。在管道铺设施工现场。该施工管理信息收集装置包括:管道信息获取单元A1,用于从作为敷设目标管道的管道信息显示的管道信息标签L获取包括管道代码的特定管道信息;以及切管信息生成单元A2,用于生成切管信息,该切管信息包括切管识别信息,该切管识别信息用于与在切管之前的管代码相关联地分别识别在施工现场中出现的多个切管。成像单元A3,用于当其位于管道连接部分附近时拍摄管道连接部分的图像; GPS接收单元A4,用于获取位置信息;输出单元A5用于直接或通过便携式存储介质在管理服务器B中上载至少包括管信息,切管信息,管连接部分的图像信息和位置信息的施工管理信息。 1个

著录项

  • 公开/公告号JP6542597B2

    专利类型

  • 公开/公告日2019-07-10

    原文格式PDF

  • 申请/专利权人 株式会社クボタ;

    申请/专利号JP20150125765

  • 发明设计人 岸 正蔵;香川 崇哲;小丸 維斗;

    申请日2015-06-23

  • 分类号G06Q50/08;

  • 国家 JP

  • 入库时间 2022-08-21 12:19:09

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号