The improvement system of soft soil foundation, the ameliorative way of connector and soft soil foundation

机译:软土地基的改良体系,连接件和软土地基的改良方法

摘要

PROBLEM TO BE SOLVED: To provide a soft ground improvement system which can eliminate a decline in the degree of vacuum due to clogging of a filter and a loss in time and work because of replacement of the filter with a new one; a connection member; and a soft ground improvement method.SOLUTION: In a soft ground improvement system 100, a ground 1 to be improved to which vacuum consolidation is applied is covered with a sealing sheet 20 so as to be separated from a peripheral part, and negative pressure of a vacuum pump 30 is applied to a plurality of vertical drains 10 installed under the sealing sheet 20 and a horizontal drain 50 engaged with the vertical drains 10 in a water conduction state in the neighborhood of a surface so as to create a pressure-reduced region while water is discharged from the pressure-reduced region by taking a route through which negative pressure is applied, so that the ground 1 to be improved is improved. The route through which negative pressure is applied is from the vacuum pump 30 through a non-hole pipe 40 and the horizontal drain 50 to the vertical drains 10 in this order, and the non-hole pipe 40 and the horizontal drain 50 are connected so as to minimize a decline of negative pressure in both connection parts.SELECTED DRAWING: Figure 1
机译:要解决的问题:提供一种软地面改善系统,该系统可以消除由于过滤器堵塞而导致的真空度下降以及由于更换新的过滤器而造成的时间和工作损失;连接成员;解决方案:在软土改善系统100中,要进行真空固结处理的待改善的地面1被密封片20覆盖,使其与周围部分分离,并且负压为负。将真空泵30施加到安装在密封片20下方的多个垂直排水口10和在表面附近以导水状态与垂直排水口10接合的水平排水口50,以形成减压区域。同时通过采取施加负压的途径将水从减压区域中排出,从而改善了要改善的地面1。施加负压的路径是从真空泵30通过无孔管40和水平排水口50到该垂直排水口10的顺序,并且无孔管40和水平排水口50被连接成这样。以便最大程度地减少两个连接部分中的负压下降。选定的图:图1

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号