首页> 外国专利> FOUNDATION SYSTEM WITH IMPROVEMENT IN SOFT SOILS.

FOUNDATION SYSTEM WITH IMPROVEMENT IN SOFT SOILS.

机译:改进了软土的基础系统。

摘要

The present disclosure is related to an answer to the different variables of differential settlements that appear in the buildings from the beginning of their construction, through a process of subsoil improvement and settlement control. With practical preventive maintenance applied in a timely manner in the different areas that are needed, as the state of charge requests change throughout their useful life. The system has the advantage of braking and improving the mechanical properties of the subsoil through the injection of fluids and dosed mixtures under pressure, from the maximum depth and decreasing during the useful life of the property. The system offers a solution variant for buildings that have their foundations resolved, as mentioned in the present invention. It is worth mentioning that the level of improvement during the useful life of the property will be particular in each case; that is, depending on the case, the fifth stage of improvement could be reached; or even a smaller number improvement stages could be reached in the entire useful life of the property.
机译:本公开涉及对从建筑物的建造开始就通过地下土壤改良和沉降控制的过程出现在建筑物中的不同沉降的不同变量的答案。在需要的不同区域中及时应用实际的预防性维护,因为收费状态要求在其整个使用寿命中都会发生变化。该系统的优点是,通过在压力下从流体的最大深度开始注入并注入一定剂量的混合物,可以制动并改善地下土壤的机械性能,并且在该特性的使用寿命期间会逐渐减小。如本发明中所提到的,该系统为解决了其基础的建筑物提供了解决方案变体。值得一提的是,在每种情况下,财产使用年限中的改善水平都是特别的;也就是说,视情况而定,可以达到改进的第五阶段;甚至在物业的整个使用寿命中都可以达到较小的改善阶段。

著录项

  • 公开/公告号MX2018009365A

    专利类型

  • 公开/公告日2020-02-03

    原文格式PDF

  • 申请/专利权人 JOSE MANUEL CRUZ CARRILLO;

    申请/专利号MX20180009365

  • 发明设计人 JOSE MANUEL CRUZ CARRILLO;

    申请日2018-08-01

  • 分类号E02D27;E02D27/32;E02D35;

  • 国家 MX

  • 入库时间 2022-08-21 11:17:05

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号