IMPROVEMENT OF SOFT FOUNDATIONS UNDER A RAPID-TRANSIT TRAM RAIL SYSTEM

机译:快速电车轨道系统下的软基础改进

获取原文
获取原文并翻译 | 示例

摘要

A case study is presented on the soft soil substrate under a rapid-transit tram system in a coastal area of southeast China. Attempts were made to improve the stability of this soil by the combined use of deep cement mixing (DCM) piles and prefabricated vertical drains (PVDs) method. Three test sections were improved separately by the DCM-PVD method, the replacement method, and vacuum preloading with PVDs (the VPL-PVD method). The DCM-PVD method yielded the largest settlement at the foundation surface during the construction period, namely 20.7% and 14.2% larger than those of the replacement method and VPL-PVD methods, respectively. In addition, the DCM-PVD method required the shortest consolidation time among the three methods and gave the highest degree of settlement (81.5%). After the rapid-transit tram system had been open to traffic for 6 months, the DCM-PVD method gave the smallest amount of post-construction settlement. As a result, the DCM-PVD method is found to be an effective method to control the settlement of soft foundations under a rapid-transit tram system.
机译:在中国东南沿海地区,在快速运输有轨电车系统的软土地基上进行了案例研究。尝试通过结合使用深水泥搅拌(DCM)桩和预制垂直排水管(PVD)方法来改善土壤的稳定性。通过DCM-PVD方法,替换方法和PVD真空预加载(VPL-PVD方法)分别改善了三个测试部分。在施工期间,DCM-PVD方法在基础表面产生最大的沉降,分别比替换方法和VPL-PVD方法大20.7%和14.2%。另外,在三种方法中,DCM-PVD方法需要最短的合并时间,并且沉降率最高(81.5%)。快速运输有轨电车系统开放使用6个月后,DCM-PVD方法施工后的沉降量最小。结果,发现DCM-PVD方法是控制快速公交系统下软土地基沉降的有效方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号