CONSTRUCTION METHOD OF CABLE-STAYED BRIDGE
CONSTRUCTION METHOD OF CABLE-STAYED BRIDGE
展开▼
机译:斜拉桥的施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a construction method of a cable-stayed bridge capable of installing a main digit between side span preceding the center span without building a plurality of intermediate piers at the side span even when the span length of the side span is large.SOLUTION: As illustrated in Figs. 3(A) and (B), an intermediate pier 7 is built, and a temporary support 21 is provided to the intermediate pier 7 between a main pier 5 and an end pier 6. Subsequently, a temporal diagonal member 22 is installed by extending from the intermediate pier 7 in both bridge axial directions between a PC digit 4A and the temporary support 21 by a cantilever extension method as illustrated in Figs. 3(C) and (D). Subsequently, a PC digit 4A is bridged across a side span SS while supporting the PC digit 4A with the temporal diagonal member 22 as illustrated in Figs. 3(E) and (F).SELECTED DRAWING: Figure 3
展开▼